"Consumer Reviews on Companies, Products and Services"

USER REVIEWS (NAVAL KB)

Indian Railway
NAAVAL KB October 14, 2009
Today it was a shocking that i had reached palwal railway station in morning 8. 17 A.M The GNP ( Palwal – New Delhi – Ghaziabad ) EMU departure before time from palwal railway station even 3 minute left and train almost crossed to platform and its out of reach at 8.17 A.M. Really sir this is very big surprised for us, we have always listen about late for Indian railway but this time before time. GNP Actual Departure time =8.20 ( as per railway schedule) from Palwal Railway Station, but today we don’t know why pilot was in so hurry. read full review »
Filled under: Lifestyle Location: India

RECENTLY UPDATED REVIEWS

Premium Car Detailing Center in Florida
AlpinHaus Shepherds
General Contractor
Inspection | Same-Day Estimates | 24/7 Emergency Response
Richmond, Virginia Roof Replacement | Weathertight Exteriors LLC
Laura Lee’s Little Learning Center
Laura Lee’s Little Learning Center
Kirk Allen Trucking & Landscape Supply
Artistic Decorative Concrete in Billings, MT | Stamped Concrete & Flatwork

REQUESTED REVIEWS

REVIEWS BY CATEGORY